RosteringUpdated ·4 min read

Free Australian staff roster templates: layout and checks

Free Australian staff roster templates: layout and checks

A spreadsheet can be a useful starting point for a roster. Whether it fits your team depends on availability changes, locations, editing responsibilities and the review process, rather than a particular staff count.

Choose a free weekly, fortnightly or industry roster template, with Excel, printable PDF and verified Google Sheets copy options. Use the weekly download for one working week or the café template for opening, service and closing plans. The downloads use one row per shift; the compact grid below is an alternative presentation, not a screenshot of those files.

Need to decide who should work each shift first? Follow the step-by-step staff roster guide, then use this template structure to record and share the result.

The weekly grid (copy this)

Use one tab per location. Rows are people (grouped by role). Columns are Mon–Sun. Each cell is start–end, role if it differs from the row, and a note if the shift is unpublished.

NameRoleMonTueWedThuFriSatSunClock-span hours
Alex ChenSupervisor07:00–15:0007:00–15:00—07:00–15:0007:00–16:00——33
Sam OkekeFOH—11:00–19:0011:00–19:00—16:00–23:0010:00–18:0010:00–16:0037
UnassignedBarista————06:30–12:0006:30–12:00—11

Names, shifts and deductions here are fictional. Clock-span hours above are start-to-finish totals before unpaid breaks. Record break inputs separately. For arithmetic only, if each displayed shift has an entered 30-minute unpaid break, the totals would be:

RowClock-span hoursEntered unpaid-break totalHours after those deductions
Alex8 + 8 + 8 + 9 = 334 × 30 minutes = 2 hours31.00
Sam8 + 8 + 7 + 8 + 6 = 375 × 30 minutes = 2.5 hours34.50
Unassigned shifts5.5 + 5.5 = 112 × 30 minutes = 1 hour10.00

These deductions do not determine required break durations, timing or whether a break is paid. Check the applicable award or agreement and coverage during breaks. Do not subtract paid breaks. Unassigned hours are planned coverage, not worked hours or wages. Enter actual dates, including the following date for overnight finishes, and check clock changes separately.

Add a second block under the grid:

  • Availability and approved leave this week (only the information needed for scheduling)
  • Open shifts still to fill
  • Labour $ vs budget
  • Published? date and who sent it

Colour unpublished shifts differently from published ones. If the team cannot tell a draft from a live roster, they will not trust either.

Rules that belong next to the template

  1. State the week-start date and all calendar dates covered. Choose a consistent layout that fits your roster period.
  2. Label hours clearly: distinguish start-to-finish spans, entered unpaid breaks and the hours after those deductions. A roster calculation is not a final payroll decision.
  3. One person, no overlapping cells. Excel will not stop you double-booking.
  4. Review closes followed by opens against the rest-between-shifts, hours and overtime rules in the applicable award or agreement. There is no single rest threshold supplied by this template.
  5. Version in the filename (Rundle-week-2026-09-07-v3.xlsx) and one owner. Group-chat copies are how last year’s Christmas roster comes back from the dead.

When to review the spreadsheet workflow

Repeated problems like these are reasons to review how the roster is shared and checked:

  • Staff text “am I on Thursday?” after you already posted the file
  • Two managers edit two copies
  • Casual loading and Sunday rates are “we’ll fix it in payroll”
  • Someone works while marked unavailable
  • You cannot answer “what did we spend on labour last Saturday?” without rebuilding the week

Keep the version shared with staff separate from drafts. Review configured pay assumptions before publication, then reconcile the plan with actual attendance and approved timesheets. Projected roster costs and final payroll costs can differ.

Check Fair Work's hours, breaks and rosters guidance and record-keeping guidance. A template does not select an award, decide entitlements or replace required records of actual work.

Move off the sheet without a six-month project

  1. Recreate roles and locations first (not people).
  2. Import or invite the team.
  3. Build one real week beside the spreadsheet. Do not delete the sheet until that week has been published and worked.
  4. Turn on timesheets the week after, not the same day.

ShiftRova’s getting started path is settings → roles → pay rates → team → first roster, for this reason.

Copy the structure into a free 14-day trial if you are done emailing FINAL-v7.xlsx.

Send me the Fair Work rostering guide