A checklist that reflects saved work
Organisation Admins can use the dashboard setup checklist for their selected organisation. It suggests one practical next step and expands to show all milestones. Hiding the checklist or skipping a wizard screen never completes work. Reopen the checklist from its dashboard link, or choose Reopen guided setup. Preferences are saved separately for each account and organisation across devices; when a preference cannot sync, a local fallback keeps dismissal usable.
Prepare the foundation
- Check business details and timezone, add locations and create team roles.
- Save pay-rate rules and check individual member rates, classification and assumptions. A saved rule is not verification that an award or rate is legally correct. Missing positive membership rates are shown clearly.
- Use Team Import for a CSV or XLSX spreadsheet (up to 3 MB and 500 rows). Review the preview, rejected rows and location assignments. The default is preparation without emails. Choose invitation delivery explicitly when ready.
Move from a plan to a shared roster
A saved draft is a separate milestone from publishing assigned team shifts. An unassigned open shift does not complete assigned publication. Check the people, dates, breaks and cost estimate before publishing. Notifications and email delivery are separate from the publication itself.
Confirm adoption and actual hours
A prepared member or an invitation email does not prove that the invitation was accepted. The checklist checks an accepted team account separately. Staff use is confirmed when an accepted member acknowledges a published shift or records a clock-in; an admin-created attendance record alone does not count. Review a clocked-out timesheet, check exceptions and approve it when correct. Approval does not itself export payroll or prove wages were paid.
Disabled sections stay disabled and are excluded from the available milestone total. The checklist does not enable industry modules, grant permissions, send invitations or alter existing settings. Progress is based on current saved records; deleting a draft, archiving staff or changing publication may change what is confirmed.
Related: Explore product walkthroughs · Build a roster · Approve timesheets.
Explore wages before adding real work
New trial organisations can open an isolated sample week during their first setup day, before real shifts or attendance are saved. It creates no real staff, invitations, roster or billing records and does not complete a milestone. Optional first-fortnight setup emails respect consent and communication preferences. See Your First 14 Days: Setup Emails and Sample Week for access, example-rate limits and the email schedule.
Checklist for the trial extension
Eligible new organisations have a separate dashboard checklist for another 14 days. It counts five verified staff and ten assigned shifts published in the same roster week. If you qualify, claim the extra days on the dashboard before the trial ends. See Your First 14 Days: Setup Emails and Sample Week for the exact requirements.